A40 Westway Expansion Joint Replacement, London
Aquaforce Concrete Services continues hydrodemolition works on the A40 Westway to enable expansion joint replacement. This critical infrastructure project forms part of a larger refurbishment effort maintaining the safety and longevity of the elevated A40, which spans from the Wood Lane Flyover to the west side of the Marylebone Flyover.
Read the case study here.
M5 J11 Golden Valley Interchange refurbishment scheme, Gloucestershire
Aquaforce Concrete Services was engaged to provide hydro demolition services to the project to facilitate the concrete repairs, bearing replacement works and bulk removal of the ballast and wing walls and stringcourses, totaling approx. 200m3 of reinforced concrete removal.
Read the case study here.
Chambers Wharf, Tideway East
Aquaforce Concrete Services was engaged by Tideway East to undertake various hydro demolition works within the 28m diameter shaft being sunk at the Chambers Wharf site, Bermondsey, south of the river and close to Tower Bridge.
Read the case study here.
Fulney Bridge, Spalding
Aquaforce carried out hydrodemolition to the bridge soffit to prepare the area for installation of two Impressed Current Cathodic Protection Systems and the subsequent application of a sprayed concrete coating, which was also undertaken by Aquaforce operatives.
Read the case study here.
Gatwick Airport Multi-Storey Car Park 6 (MSPC6) Rehabilitation Works
Aquaforce undertook hydrodemolition works on Gatwick Airport Multi-Storey Car Park 6, removing 300m3 of concrete. Read the case study here.
Aquaforce was appointed by Skanska on behalf of WCA to remove between 700 and 1000mm of the 700mm deep reinforced concrete cantilever deck ends using hydrodemolition, in order to expose the existing steel reinforcement of the three parallel viaducts.
Read the case study here.
The Witton and Bromford Viaducts carry the M6 between Junction 7 (Great Barr) and Junction 5 (Fort Dunlop). Aquaforce carried out hydrodemolition services as part of the improvement works. Read the case study here.
Following a lorry fire under the Dunton Lane bridge on the M6 Toll, Aquaforce was mobilised quickly to provide information and advice regarding the works required to repair the damage, which included hydrodemolition to the soffit and the walls. Read the case study here.
The M54 bridges in Shropshire required concrete repairs, bearing installation and bridge deck improvements. Aquaforce was contracted to carry out the hydrodemolition works which included concrete removal and removal of the central pier bearing shelves.